Renovation · CEC Section 8 & 26

Basement Wiring Load Calculator

Plan total circuit count, breaker requirements, AFCI/GFCI protection, and sub-panel needs for finishing a basement project.

1. Finished Basement Plan

2. Circuit Plan & Load Summary

ESA Permit Required
RECOMMENDED NEW CIRCUITS
5 Circuits
ESTIMATED BASEMENT DEMAND LOAD
24.2 Amps @ 240V
SUB-PANEL RECOMMENDATION
60A Basement Sub-Panel
Sub-Panel Recommended: Installing a 60A basement sub-panel makes pulling local runs far cleaner and preserves main panel slots.

Basement Code Requirements

  • All 120V 15A/20A basement living area outlets require AFCI protection per CEC Rule 26-724.
  • Sump pumps require a dedicated branch circuit (GFCI protected if within 1.5m of water source).
  • Full basement finishing requires an ESA permit and inspection prior to closing drywall.
Ad slot — calculator page banner